The Bessire's
Monday, January 24, 2011
Toilet
Kevan had to move the hole for toilet. He had to jack out the hole and add a slanty drain to move it over. He recemented it.
Shower before being laid
Kevan laid the floor tiles and cut them to fit floor. Shower not done yet.
Shower Floor
Kevan laying tiles and cutting them to fit the floor.
shower 2011
Kevan laying floor tiles.
More shower pictures
Side view of the shower is grouted, tile on the wall not been grouted yet.
Shower
This is the grouted inside shower. Jan. 22nd.
‹
›
Home
View web version