Kevan started tiling the shower today.
Yesterday we made a trip to Pocatello to pick up tiles at Home Depot since Twin Store did not have enough tiles we needed.
We also picked up a new cabinet.
We got snow today.
Kevan has pour cement in the bottom of the shower.
Kevan is cutting the cement board for the shower walls.
Kevan putting plastic down then the dry wall.
Basement remodling job
Kevan has put the cement board in the shower
Thursday, December 9, 2010
Kevan remolding basement bathroom
Kevan has painted our bedroom and he is redoing the bathroom. He is tiling the whole shower and half the way up the wall of the sink and toilet. We are putting in new carpet Monday.
I will have pictures as things progress.
‹
›